Monday, November 10, 2008

Client Project Reflection

Our team worked really well together on the service project. The greatest thing was to hear each others feedback on our ideas. For instance, some idea were not thought all the way through and we exposed challenges with the ideas as well as ways to improve the ideas. The best/coolest thing was our group all pretty much decided that we should do a fundraiser without much hesitation; at our first group meeting we all sat down and said basically the same thing. This was also really neat because we were the only group to think about fundraisers so it was even cooler that we all agreed right away about what we should do. However, I would say that our biggest challenge was making all of our ideas flow together when drafting the final proposal. This isn't a huge deal as the writer could revise them to make them sound similar and is a pretty trivial thing to be the biggest challenge since it can be fixed, but just goes to show you how well we worked together. The only other flaw in our dynamic was probably communication. We communicated a lot (texts, calls, meetings, and facebook) but we always ended up scrambling right before the meeting time to make sure everyone was coming; however, the team always feel into place. All in all, I think our group was awesome at collaborating for this project and I wish all my group projects went this smoothly.

No comments: